Trinidad Coastal Land Trust is working to improve public access at its properties along scenic drive.
Houda Point
We are in the process of implementing public access improvements funded by the State Coastal Conservancy. Improvements include ADA accessible parking and path, restroom area, picnic tables, benches and interpretive signing. These improvements will take place in the Spring of 2022 and are scheduled to be completed in 2023. More about Houda Point.
Luffenholtz Beach
As the new landowner and property steward in 2019, TCLT will be starting a planning process in 2020 to design access and safety improvements to the trails and visitor areas at Luffenholtz Beach and Tepona Point, with funding from the Wildlife Conservation Board. These are improvements will likely take place in 2023. More about Luffenholtz Beach.
Little River Trail Project
The Project Team, including Trinidad Coastal Land Trust (TCLT), and coordinated by the Redwood Community Action Agency, has been assembled and we will be kicking off the project with community outreach, technical studies, environmental analysis, and engineering design for the Project Approval and Environmental Document phase of the Little River CA Coastal Trail project which will connect pedestrians and bicyclists from Clam Beach to Westhaven. The future trailhead will be on TCLT’s 15-acre parcel at the end of Scenic Drive above Moonstone Beach. More about Little River Trail.